ENDE


Image 1

Berthing at the port of destination: MV “Beluga Emotion“


Image 2

On her way to the port of destination: MV “Beluga Emotion“ with seven RTGs on deck.


Image 3

On her way to the port of destination: MV “Beluga Emotion“ with seven RTGs on deck.


Image 4

On her way to the port of destination: MV “Beluga Emotion“ with seven RTGs on deck.


Image 5

On her way to the port of destination: MV “Beluga Emotion“ with seven RTGs on deck.


Image 6

The discharge of the RTGs – each weighing 200 tons – is being carried out with the board cranes of the MV “Beluga Emotion“ in front of the Vesuvius in Naples.