Here you can download printable pictures. Please click on the photo to get the pop-up-version and then use your right mouse button with "picture safe below".
Power: Transcar
The MV “Beluga Intonation“ while berthing in the harbour of Ortona in Italy. | Preparing the cargo for lifting onto the multipurpose heavy-lift project carrier. | ||
The Beluga team used the outstanding capabilities of the vessel and lifted the reactors by employing only one crane in each case. | The cargo to be loaded in the Italian port of Ortona consisted of two reactors, both weighing 326 tons and measuring 36.5 x 8 x 11.5 metres. | ||
Except the saddles the cargo was completely wrapped in plastic for protection. |
Power: Linde
The modules for the oil- and gas industry are loaded with on-board cranes to the MV "Beluga Fanfare" | Supervison of loading by supercargo. | ||
The two identical block-shaped boxes are more than 14 metres long, 8 metres wide and 15 metres high, each one weighs 217 tons. | The challenge: the height of the cargo pieces reduces the swing area of our cranes. | ||
The transport was made from Bremen to Ras Laffan, a harbour city in Qatar. | The MV "Beluga Fanfare" with two Liebherr harbour cranes and the two heat exchanger boxes. |

Oil & Gas: Petronas
MV "Beluga Intonation“ is discharging the cargo of the alongside moored MV “Beluga Constitution”. | The cranes of MV “Beluga Intonation” have to lift every single piece from the MV “Beluga Constitution” at portside to the barge at starboard. | ||
The cranes of MV “Beluga Intonation” have to lift every single piece from the MV “Beluga Constitution” at portside to the barge at starboard. | Transferring the cargo from side to side required precise ballasting and good command of the cranes. | ||
Transferring the cargo from side to side required precise ballasting and good command of the cranes. | |||
The Beluga-Team supervised the precise execution of all operations. | The Beluga-Team supervised the precise execution of all operations. |

Oil & Gas: Saipem
MV “Beluga Resolution” at sea. | MV “Beluga Resolution” at sea. | ||
From September 28th to October 11th 2008, MV “Beluga Resolution” transported an urgently needed offshore module to Gulf of Guinea in West Africa. | From September 28th to October 11th 2008, MV “Beluga Resolution” transported an urgently needed offshore module to Gulf of Guinea in West Africa. | ||
From September 28th to October 11th 2008, MV “Beluga Resolution” transported an urgently needed offshore module to Gulf of Guinea in West Africa. | The loading onto the multipurpose heavy-lift project carrier took place in the port of Arbatax/Sardinia. | ||
The loading onto the multipurpose heavy-lift project carrier took place in the port of Arbatax/Sardinia. | |||
Oil & Gas: Hyundai
A demethanizer unit with a length of 53.38 metres is being delivered. | At this moment, nearly 300 tons are hanging on starboard. | ||
The MV “Beluga Constellation“ is lifting a demethanizer unit on board. | The MV “Beluga Constellation“ is lifting a demethanizer unit on board. | ||
The second demethanizer unit is being lifted on board safely. | The experienced crew handles loading and lashing of the valuable cargo without any problems. |
Oil & Gas: Deugro/Linde
The top part of the C3 splitter is being loaded on the tank top of the MV “Beluga Intonation”. | Under the surveillance by the team of Beluga: The loading of the bottom part of the C3 splitter. | ||
Just a few months ago, the MV “Beluga Intonation” has been cut in the middle, lengthened and provided with stronger board cranes. | The board cranes of the multipurpose heavy-lift project carrier are lifting the bottom part of the C3-splitter onto the weather deck. The unit weighs 340 tons and is 63 meters long. | ||
On the pier ready for loading: The Demethanizer, measuring 66 meters and weighing 340 tons. |
Oil & Gas: Idesa
The defractionator with a length of 66 metres is being loaded. | The defractionator with a length of 66 metres is being loaded. | ||
The MV “Beluga Intonation” is lifting a defractionator on board with the help of his own cranes. | At this moment, nearly 300 tons are hanging on starboard. | ||
The experts at Beluga Group ensure that the valuable project cargo gets to its destination safely. | |||
Oil & Gas: Technip
One of both reels is unlashed. | The MV “Beluga Revolution“ discharging a reel. | ||
One of the two reels with a diameter of more than nine metres and a weight of 205 tons. | The on-board cranes at work. | ||
The multipurpose heavy-lift project carrier discharged the reels directly to the installation vessel “Venturer”. | |||