Enercon


Image 1

The MV “Beluga Efficiency“ is loading rotor blades.


Image 2

The cargo is stowed in the hatches and on deck.


Image 3

All in all 148 cargo elements were shipped from Emden to Toronto.


Image 4

During the project the vessel was loaded and discharged six times.


Image 5

Together, the board cranes can lift up to 240 tons.


Image 6

All in all six shipments were necessary.



Opens internal link in current windowHere you can download reference pictures

 

print | recommend 
http://www.beluga-group.com/Enercon.585.0.html?&L=%252F%255C
en
| RSS-Feed
 
content.html