
Image 1
The top part of the C3 splitter is being loaded on the tank top of the MV “Beluga Intonation”.


Image 2
Under the surveillance by the team of Beluga: The loading of the bottom part of the C3 splitter.


Image 3
Just a few months ago, the MV “Beluga Intonation” has been cut in the middle, lengthened and provided with stronger board cranes.



Here you can download reference pictures