Acciona


Image 1

The loading of the 360 tower sections.


Image 2

The loading of the 360 tower sections.


Image 3

Each tower sections is up to 29 metres long and weighs more than 50 tons.


Image 4

Only the lashing of the 26 frames, which held the second layer of the tower sections, took a whole day to fix.

Image 5

The space-saving transport reduced the number of shipments.


Image 6

This innovative way of stowage saves time and reduces costs.


Image 7

An experienced crew handles the loading.


Image 8

The frames can be simply dismantled and easily used again at the next opportunity.


Image 9

The stable frameworks may even become part of the standard equipment of the Beluga fleet.



Opens internal link in current windowHere you can download reference pictures

 

print | recommend 
http://www.beluga-group.com/Acciona.554.0.html?&L=%252F%255C
en
| RSS-Feed
 
content.html